Horizon Europe Lump-Sum Budgets: What Changes for Life Science SMEs

Nov 23, 2026 | Biotech

Image Source: Image generated using Google Gemini
Independent Contributor
Written by: Robert Grabarevic, Founder
On behalf of: Scalebiz

Ask a life science SME what a Horizon Europe lump sum changes, and the usual answer is “no more timesheets”. That part is true. The Commission’s own guide [2] says lump sum funding removes all obligations on actual cost reporting and financial ex-post audits.

What it does not remove is budget work. The work moves. Instead of proving costs after the money is spent, you fix the price of each work package before the project starts, and you are paid when each package is done. For a biotech or medtech team whose timelines depend on patients, regulators and suppliers, that shift matters more than the timesheets.

What a Horizon Europe lump sum is

Under the Lump Sum Model Grant Agreement [1], the grant takes the form of “a lump sum grant for the completion of work packages” (Article 5.1). The total is split into shares per work package and per beneficiary, and that breakdown becomes Annex 2 of the grant agreement (Article 5.4; guide [2], “Grant preparation”).

A share is eligible when it is set out in Annex 2 and the work package is completed and properly implemented (Article 6). The guide puts it plainly: payments depend on the completion of activities, not on a successful outcome (“Basic principles”). An experiment with a negative result still counts, as long as the work described in Annex 1 was done.

Where the budget work moves: into the proposal

The cost work happens once, before submission, in the detailed budget table. You estimate costs per cost category, per beneficiary and per work package, and the table generates the lump sum breakdown automatically (guide [2], “Writing a lump sum proposal”). Indirect costs are a flat 25% of eligible direct costs (Commission Decision on lump sum contributions [3], point 3).

Those estimates are evaluated. Experts check them against the proposed activities under the implementation criterion. Overestimates lead to concrete recommendations, and serious problems lower the implementation score (guide [2], “Evaluation of a lump sum proposal”; Decision [3], point 3). Personnel costs above the Horizon Europe dashboard values must be justified in the table’s “Any comments” tab.

Two consequences for a small team. The estimates must approximate your real costs; they are not a wish list. And once the grant is signed, the table itself is not part of the grant agreement. What binds you is Annex 2 and the work described in Annex 1.

The work-package rule: late is not the same as lost

At the end of each reporting period, the coordinator declares every work package completed or not completed. Interim payments cover the shares of the approved, completed packages (Article 22.3.3; guide [2], “Reporting and payment (1)”). A package that is not finished is simply not paid yet.

That is a timing problem, not a write-off. The guide says an incomplete work package can be completed and paid in a subsequent reporting period, and the Commission Decision says the same (section 1). Partial completion comes in only at the end. For the last reporting period, beneficiaries may exceptionally declare partial lump sum contributions for packages not completed, for example because of force majeure or technical impossibility (Article 21.2). The share is then paid partially, in line with the degree of completion, decided case by case (guide [2], “Acceptance of work packages”).

When What happens to an unfinished work package Source
End of an interim reporting period Declared not completed; its share is not paid in that interim payment Art. 22.3.3 [1]; guide [2], “Reporting and payment (1)”
A later reporting period Can be completed, declared and paid then Guide [2], “Reporting and payment (1)”; Decision [3], section 1
Final reporting period Exceptionally declared as partial; paid in line with the degree of completion, case by case Art. 21.2 [1]; guide [2], “Acceptance of work packages”
Conditions never met Grant reduced by up to that package’s share, after a contradictory procedure Decision [3], section 1

The practical risk for an SME is cash flow. A delayed package can move a large part of your budget from the first interim payment to the second, or to the final one.

Two life science examples

The figures below are illustrative. Both projects run for 42 months, with reporting periods ending at months 18, 30 and 42.

Patient recruitment. A medtech SME leads WP4, a clinical feasibility study with a share of €300,000 in Annex 2. The plan is 120 patients by month 18; recruitment reaches 80. At the first report, WP4 is declared not completed and its share is not paid with the first interim payment. Recruitment finishes in month 24, WP4 is declared completed at the second report, and the €300,000 arrives with the second interim payment. Nothing is lost, but the money comes a year later than planned.

Regulatory approval. A biotech SME plans a first clinical study in WP5, with a share of €250,000. At month 42 the competent authority has still not approved the trial. The protocol, site preparation and data management work are done; the study itself has not started. At the final report, the consortium can ask to declare WP5 as partially completed. Whether the delay is accepted as a reason, and how much is paid, is decided case by case. If the conditions are never met and nothing partial is accepted, the grant can be reduced by up to the whole €250,000.

Both cases point to one design choice. Keep work you control apart from work that waits on someone else. Put the approval-dependent study in its own, smaller package, and keep protocol writing, site set-up and data management in packages you can finish on your own schedule. The guide notes that long work packages can be split along reporting periods (“Project design: Work packages”).

Consortium splits: one package, one payment

Annex 2 shows each beneficiary’s share in each work package, but payment follows the package, not the partner. The Commission pays the shares for completed and approved packages to the coordinator, who distributes them according to the consortium agreement (guide [2], “Payment schedule”). The guide also notes that the actual distribution of the lump sum is invisible to the Commission.

For a small company in a large consortium, this has a sharp edge. If four partners share a work package and one is late, nobody’s share in that package is paid until it is complete. Write into the consortium agreement what happens then: whether partners who finished their tasks are advanced money from other funds, and how a partial final payment is divided. Costs actually incurred no longer matter to the Commission, but who does the work still does (guide [2], “Consortium”).

What does not change, and a checklist before you submit

Under a Horizon Europe lump sum, you still keep records that prove the work was done as described in Annex 1, such as deliverables, publications and prototypes (Article 20; guide [2], “Keeping records”). Checks and audits focus on the technical implementation of the action, not on costs, and national accounting rules still apply to your company (Decision [3], section 2.2).

Before you submit, check that:

  • every work package ends in something a reviewer can verify: a deliverable, a dataset, a prototype or a report;
  • work that waits on patients, ethics committees, regulators or suppliers sits in its own package, not inside one you could otherwise finish;
  • long packages are split along reporting periods, so one delay does not hold back a whole period’s work;
  • the cost estimates in the detailed budget table are close to your real costs, and any personnel rate above the dashboard values is explained in “Any comments”;
  • the consortium agreement says how money is shared when a package is late, and how a partial final payment is divided;
  • your cash plan survives an interim payment that arrives one reporting period late.

 

Author Bio

    Robert Grabarevic is the founder of Scalebiz, a radar for public funding calls and tenders across the EU, the US and the UK. He built it as a tool for himself, so that he would not have to re-read the same funding rules for every application.
    References: 1. European Commission. EU Grants: Lump Sum Model Grant Agreement (Multi & Mono), version 1.0, 1 November 2024. Articles 5.1, 5.4, 6, 20, 21.2 and 22.3.3. https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/common/agr-contr/ls-mga_en.pdf 2. European Commission. Lump sum funding: what do I need to know? A guide for participants, version 3.0, 24 June 2024. Cited by slide title. https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-funding-what-do-i-need-to-know_he_en.pdf 3. European Commission. Decision authorising the use of lump sum contributions under Horizon Europe. Annex, sections 1 and 2.2, and point 3. https://ec.europa.eu/info/funding-tenders/opportunities/docs/2021-2027/horizon/guidance/ls-decision_he_en.pdf All sources checked on 13 November 2026.
    The author is the founder of a company that provides grant and procurement funding information and therefore has a commercial interest in the subject matter discussed in this article. All content is published for informational purposes only and does not constitute medical, legal, or investment advice. For more information, see our Terms and Conditions

    Articles that may be of interest

    Articles that may be of interest